Wednesday, October 25, 2006

Glass in the passageway windows

Finally, after much ado, the glass goes in and the passageway windows are complete.

When compared to the original windows before the renovation…

…there’s been quite an improvement !

 

 

Posted by Russell at 00:00:00 | Permalink | Comments Off

Monday, October 23, 2006

Oct 23 update

Work continues, finishing the ceiling above the breakfast table nook


and
 
the second bathroom ceiling
 
.

and still working on the woodwork in the library !

While Rocque is preparing the radiator heaters.

Posted by Russell at 00:00:00 | Permalink | Comments Off

Thursday, October 19, 2006

Oct 19 update

Removing the paint from the library doors and woodwork

 

The window frames awaiting glass

Varnishing the shutters

 

Posted by Russell at 00:00:00 | Permalink | Comments Off

Thursday, October 12, 2006

Oct 12 update

final installation of the new window frames

looking out from the kitchen to the passageway

the kitchen ceiling

glass suggestions for the passage windows 

bathroom sink option

 

Posted by Russell at 00:00:00 | Permalink | Comments Off

Thursday, October 5, 2006

Oct 5 update

The calcareo floor in the kitchen

 

Nic’s bedroom

Paolo sanding the shutters

 

Posted by Russell at 00:00:00 | Permalink | Comments Off

Thursday, September 28, 2006

Sep 28 update

Calcareo tiles take shape and form in the kitchen

 

Amazing new window frames now dominate the passageway and make a dramatic statement and change the apartment completely

 

and a very self satisfied, even smug, maestro de obra Ramon smiles after a really good days work !

 

Posted by Russell at 00:00:00 | Permalink | Comments Off

Tuesday, September 26, 2006

Sep 26 update

Painting continues

 

and the master bathroom takes shape

 

Posted by Russell at 00:00:00 | Permalink | Comments Off

Friday, September 22, 2006

Sep 21 update

As work continues, we’re having to remove around quite a lot of “stored” items. Never mind, the most important progress is the painting.

 

Plaster is applied to the walls to fix imperfections.

 

All kitchen plumbing is now finished and so cement is applied to seal over new water and gas pipes, before plastering.

 

Kitchen ceiling repaired

 

Repairs done to the old frames, involving much soldering and replacing of rusted metal, and now with the final pieces of the old glass removed, we await the installation of the new frames and then the glass in the passageway windows


Posted by Russell at 00:00:00 | Permalink | Comments Off

Tuesday, September 19, 2006

Sep 19 update

Painting begins…

the undercoat already makes a big difference…

And after a trip to San Pedro, ceramic tiles (not these) have been selected…these just look so nice that we snapped a couple of photos

 

Posted by Russell at 00:00:00 | Permalink | Comments Off

Saturday, September 16, 2006

Sep 16 update

Work continues, dismantling the final part of the old aluminium window structure

and installing the new support beams for the kitchen section

preparing walls, doors and shutters for painting

the wood for the passageway has arrived

and various views of the apartment

and the team at work